Money Down the Drain: Tallying the Cost of the Government Shutdown

The U.S. government shutdown began one month ago today. Thankfully, the government has been reopened, and the fiscal showdown is fast becoming a distant memory that we’re all trying to forget. But details are slowly emerging on the shutdown’s actual costs and damage. We’ve gotten our hands on some of that information, and when it comes to our oceans and coasts, it doesn’t look pretty.

Based on information given to us by sources within the National Oceanic and Atmospheric Administration (NOAA), the cost of just one small part of the shutdown—recalling NOAA’s fleet of research ships and planes—added up to more than half a million dollars.

That’s half a million dollars just for NOAA’s ships and planes to return to port and sit idle while the shutdown fight played out on Capitol Hill. That’s half a million dollars that will come out of NOAA’s already-tight operations budgets. And that’s half a million dollars that could have been spent on ocean research and conservation instead.

In addition to the giant pile of cash that was wasted to literally accomplish nothing, the shutdown also interrupted critical research expeditions that now might never be completed. For example, surveys of marine mammals and sea turtles—including endangered leatherback sea turtles—were interrupted and canceled.

The shutdown blocked coastal mapping and underwater surveys along the mid-Atlantic, in the Strait of Juan de Fuca in Washington state, along the Southern California coast and in Delaware Bay. Collection of long-term data sets for climate research was stopped. And fisheries surveys in the North Pacific, Gulf of Alaska and the East Coast continental shelf were brought to a halt.

Here is a detailed account of each of NOAA’s research ships and planes, what they were doing when the government shutdown ended their work and how much it cost to return them to port temporarily while the shutdown persisted:

  • NOAA Ship Ronald H. Brown had to spend $277,000 and 13 days traveling the 2,600 miles to return to port, stopping the Atlantic 20 Degree West Hydrographic Survey to complete a decade’s long data-set integral to the study of global climate change.
  • NOAA’s 56RF (Twin Otter) plane had to return 2,800 miles from Monterey, Calif., to Tampa, Fla., at a cost of $7,000, stopping the survey of endangered leatherback turtles.
  • NOAA’s N57RF (Twin Otter) plane had to return 1,200 miles from Westhampton, N.Y., to Tampa, Fla., at a cost of $3,000, stopping the mid-Atlantic marine mammal and sea turtle survey.
  • NOAA Ship Henry B. Bigelow had to spend $14,000 and one day to return 200 miles to port, stopping the Autumn Bottom Trawl Survey to determine the distribution and abundance of fish and marine life over the East Coast continental shelf.
  • NOAA Ship Oscar Dyson had to spend $14,000 and one day to return 200 miles to port, stopping the Juvenile Walleye Pollock and Forage Fish Survey to assess their biomass, community structure and biological composition. The ship was also scheduled to examine physical and chemical oceanography and recover several moorings in the Gulf of Alaska.
  • NOAA’s N42RF (P-3) plane did not deploy to Fairbanks, Alaska, as scheduled to study Arctic weather in newly ice-free regions and test hypotheses in ocean heat storage and the impact on atmospheric temperature and humidity. This survey is important for understanding the rapidly changing Arctic environment.
  • NOAA’s N68RF (King Air) plane had to return 1,100 miles from Atlantic City, N.J., to Tampa, Fla., at a cost of $16,500, stopping the coastal mapping along the mid-Atlantic. These maps provide important information used for shipping, navigation and more.
  • NOAA Ship Fairweather had to spend $56,000 to return 1,000 miles to port (which took four days), stopping hydrographic surveys of the Southern California coast.
  • NOAA Ship Thomas Jefferson had to spend $10,000 and one day to return 250 miles to port, stopping a hydrographic survey of Delaware Bay.
  • NOAA Ship Rainier had to return 1,700 miles to port (which took seven days) at a cost of $105,000, stopping hydrographic surveys of the Straits of Juan de Fuca.

And this is just a snapshot of the shutdown’s effects on widely used ocean research conducted by one government agency. As we look ahead to the next fiscal showdown in January, when current funding for the government will run out again, let’s hope history doesn’t repeat itself. The ocean, the people who make their living from it and American taxpayers can’t afford it.